fundo-ambiental

Project designation | Almancil 4: Energy Efficiency Measures

Project code | 199

Main objective | To protect the environment and promote resource efficiency

Intervention region | Faro

Beneficiary entity | Almancil 4 – Decorations and Restoration, Ltd

 

Approval date | 05-08-2023

Start date | 12-06-2023

Completion date | 12-05-2025

Total eligible cost | 148,875.50 euros

European Union financial support | 104,212.85 euros

 

Objectives, activities, and expected/achieved results |

 

The interventions to be carried out in this project will consist of a set of responses to the measures identified in the ex-ante energy certificate.

 

Regarding typology 2 – Intervention in technical systems, the installation of two more efficient refrigerated chambers is intended to replace the current vertical refrigerators, equipped with a heat recovery system, for the production of sanitary hot water for the building.

 

As for the measures to be implemented under typology 3 – Production of energy based on renewable energy sources (RES) for self-consumption, the promoting entity intends to proceed with the installation of an autonomous solar photovoltaic system under a self-consumption regime.

 

 

In addition to these typologies, which derive from the Improvement Measures identified by the Qualified Expert, it is also intended to include in the application the following immaterial actions: Energy audits and the issuance of the ex-ante and ex-post Energy Certificate, as well as the projects for the remodeling of the Refrigeration and Freezing systems with Heat Recovery for Sanitary Hot Water and also the project of the Photovoltaic System.